+ 1(905)-862-8488

Second Storey Master Bedroom & En-suite Above Garage

The Markham project is coming along well. The Pella windows are installed, the black colour adds a nice contrast. The stucco is starting and the drywall will be started this week. Interior finishes will be starting shortly. Note the interior spray foam insulation. Timberidge spray foams all jobs, it provides a superior seal on any home or addition.

Timberidge carpentry’s latest project in Markham, removing the roof above the garage and adding a 2nd storey with master bedroom and en-suite.

See the additional gable over the existing master bedroom which balances the front of the home. Due to the finished basement, Timberidge carpentry will be using radiant floor heating with a boiler system for the heat source.

The project was started on Nov 12th 2018, all the demolition is completed, framed, roofing done, eyebrow built and starting on the inside.

Give Timberidge carpentry a call today if you would like to make some changes to your home and add some additional living space.

See Gallery